Areas We Service
![](https://hmoag.com/wp-content/uploads/2021/10/Group-33.png)
Upstream
Offshore Platform, Onshore Upstream, FPSO, FSO, FSRU, Subsea
![](https://hmoag.com/wp-content/uploads/2021/10/Group-33-1.png)
Midstream
Gas Processing, Pipeline, Compressor Stations, Pumping Stations, Shipping, Trucking, Rail, Loading/Unloading Terminals.
![](https://hmoag.com/wp-content/uploads/2021/11/Group-33-1-1.png)
Downstream
Refining, Chemical plants, Petrochemical Plants.
![](https://hmoag.com/wp-content/uploads/2021/11/Group-33.png)
Other Service Areas
LNG, FLNG, Power Plants, Oil Sands, Geothermal…etc.
Why RAM?
RAM Stands for Reliability, Availability, and Maintainability study. RAM methodology provides a decision support to oil and gas companies across all sectors by using quantitative tools and a methodological approach to evaluate the production performance of new or existing development. Specifically, RAM analysis supports key decision makers across all phases of the project through:
Design optimization and integration
Operational strategy recommendations
Performance forecasting
Process debottlenecking
Identification of key equipment/unit contributors to production losses
Reduction of asset risk
Benchmarking of performance
Mitigation of unforeseen risks
Reduction of operating cost
![step1 step1](https://hmoag.com/wp-content/uploads/2021/11/step1-235x265.png)
![step2 step2](https://hmoag.com/wp-content/uploads/2021/11/step2-235x265.png)
![step3 step3](https://hmoag.com/wp-content/uploads/2021/11/step3-235x265.png)
![step4 step4](https://hmoag.com/wp-content/uploads/2021/11/step4.png)
![Group 72](https://hmoag.com/wp-content/uploads/2021/11/Group-72.png)
How RAM?
Following kick-off of the project, our team will gather all the information required to conduct the study. The information will be consolidated in a reference report that documents all the assumption and input data including equipment reliability data and configuration that will be used in the simulation model development. Using the agreed reference report, the base case RAM simulation model will be developed. The results generated will be presented to the project team. Using the outcome of the model, several sensitivity cases may be selected in order to evaluate different design and operational philosophies to maximize production and quantify risk. Finally, a RAM study report will be delivered at the end of the study.
Kick-off & Data
Collection
Reference
Report
RAM
Model
Sensitivity
Analysis
Study
Report